Carpentry

Formwork Carpentry

Formwork is the mould your structure inherits. Ours is set out from the drawings, braced for the pour it is actually taking, and stripped without tearing up the face you have to live with.

Plywood formwork face with timber walers and steel snap ties

Braced for the pour it is actually taking

Formwork fails in one of two directions. Either it moves during the pour, or it will not come off cleanly afterwards. Both are decided before any concrete turns up, in the bracing, the ties, the joint sealing and the release agent.

We size falsework and bracing to the real pour rate and head of concrete rather than to habit, because a blowout costs a great deal more than the day it takes to brace properly. That covers edge and slab formwork, wall and column forms, stair and landing forms, and the set-downs and penetrations that tend to get missed until the plumber arrives. Set-out gets checked against the drawings and against the actual site datum, not against whatever was built last.

Stripping is part of the job

A crew that pours and disappears leaves the builder with formwork to strip, stack and cart away, plus a slab edge chipped in the process. We strip when the concrete has the strength to take it, clean and stack the material for reuse, and clear the area so the following trade can get in.

It sounds like housekeeping. On a tight programme it is worth a day, sometimes two.

What's included

  • Slab, edge and set-down formwork
  • Wall, column and blade forms
  • Stairs, landings and infill
  • Penetrations, box-outs and rebates
  • Falsework and bracing sized to the pour
  • Stripping, cleaning and stacking included
Get a quote

Written price with the scope stated.

FAQ

Formwork Carpentry: your questions

Either. Most builders have us supply it, but we are just as happy running your ply and bearers. If the material on site is past being reused for a face you intend to leave exposed, we will say so before we use it.
Yes, and we would rather. Where the drawings leave falsework design to the contractor, we will point that out and confirm who is carrying that design before we start.
It depends on the size and what we already have booked. Tell us the pour date on the first call rather than after you have ordered the concrete, and we can tell you straight away whether we are able to hold it.
Get started

Tell us what you need built.

Send drawings, photos or just a description. Straightforward jobs get priced from what you send. Anything structural gets looked at first. You get a written quote with the scope stated either way.