Concrete & Safety Barriers for Commercial and Industrial Sites

Warehouse floors, hardstands, barriers, bollards and rack protection, staged around operations so the site keeps running while the work happens.

Short answer

Homestead Group installs and repairs industrial concrete floors, hardstands, safety barriers, bollards and rack protection across Sydney, working zone by zone and out of hours so facilities keep operating. The slab and the barriers anchored into it are handled by one contractor.

What usually goes wrong

The problems we hear about most.

  • Work that appears to require shutting the facility for a day you cannot spare
  • Struck columns and damaged racking uprights that then need engineering assessment
  • Hardstand poured decades ago for lighter vehicles than now drive on it
  • A barrier contractor and a concrete contractor each blaming the other when a fixing lets go

How we work with you

  • Staged zone by zone, including nights and weekends, and priced that way honestly
  • Inductions, SWMS and insurances current and supplied before we arrive
  • Substrate checked and confirmed before anything is drilled
  • The slab and the barriers fixed into it under one contractor
  • We raise a detail that will not work rather than substituting quietly
Get a quote
FAQ

Questions from commercial and industrial

Yes, and for most facilities that is the only sensible way to do it. Core drilling noise and concrete curing times are the real constraints, and we will map them against your dispatch or trading hours before quoting.
Yes. Zone by zone with proper exclusion is standard for us. Where separation cannot be maintained safely we will say so and propose out of hours instead of working around it badly.
Generally you cannot tell by looking, because the fixings are concealed. Without documentation of what was installed, an assessment against the current specification is the only reliable answer, and it is worth doing before an incident.
Yes, which matters more than it sounds. A barrier is only as good as the slab it is anchored into, so having one contractor responsible for both removes the argument about which one failed.

Not quite you?

The standard is the same across all four. Only the paperwork and the scheduling change.

Get started

Tell us about the job.

Send drawings, photos or just a description. Straightforward jobs get priced from what you send. Anything structural gets looked at first. You get a written quote with the scope stated either way.